菜宝钱包(caibao.it)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台、usdt跑分平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt无需实名寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键无实名出售Usdt。

首页体育正文

皇冠官方app(www.hg108.vip):Work on Phase 2 of Sarawak-Sabah link road, Trans-Borneo Highway to begin next year

admin2022-08-257

皇冠官方appwww.hg108.vip)是一个开放皇冠官方代理APP下载、皇冠官方会员APP下载、皇冠官方线路APP下载、皇冠官方登录APP下载的官方平台。皇冠体育官方APP上最新登录线路、新2皇冠官方网址更新最快。皇冠体育官方APP开放皇冠官方会员注册、皇冠官方代理开户等业务。

Prime Minister Ismail Sabri Yaakob says construction of Phase 2 of the Sarawak-Sabah link road and the Trans-Borneo Highway will start early next year. – The Malaysian Insight file pic, August 7, 2022.

THE federal government has approved the construction of Phase 2 of the Sarawak-Sabah link road (SSLR) and the Trans-Borneo Highway (LTB), which will commence early next year, Prime Minister Ismail Sabri Yaakob said.

He said the technical study of the two projects that connect Miri to Limbang and Lawas, and are expected to take three to five years to complete, is now at the final stage.

He said the projects will not only enable residents in northern Sarawak to go to Sabah via two road network options but also provide benefit to those living around Mulu, Long Seridan, Nanga Medamit, Long Lopeng, Ba’kelalan and Merarap, who still depend on logging roads.

“Those travelling from Miri to Limbang and Lawas via Brunei can use the 96km LTB stretch, which will be ugpraded into a two-lane dual-carriageway.

“For those who choose to avoid going through Brunei to go to (Sabah), they can travel via the SSLR Phase 2, which spans 326km and is a continuation of the SSLR Phase 1 from Simpang Gelugus to Long Lopeng,” he said when opening the Pujut section of the Sarawak portion of the Pan Borneo Highway, in Miri today.

Also present were Sarawak Premier Abang Johari Openg and Senior Works Minister Fadillah Yusof.

,

U8HX.COM官网www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,U8HX.COM官网单双哈希、幸运哈希、平倍牛牛等游戏数据开源、公平、无任何作弊可能性。

,

Ismail said the projects, which cost RM10.62 billion, will also enable communities and residents in Miri, Limbang and Lawas to enjoy a safer and more comfortable road network.

On the opening of the Pujut section of the Pan Borneo Highway, Ismail said it was a continuation of the successful construction of highway projects in the peninsula.

“The implementation of the Pan Borneo Highway project is the federal government’s commitment to develop a planned, systematic and efficient infrastructure network for Keluarga Malaysia in Sarawak,” he said.

“The scope of this Pujut section construction involves upgrading of the federal roads, the construction of two bridges and four bus stops, which started on November 1, 2016 and was fully completed on July 2.” 

Ismail said the project will also expand transport network and connectivity between towns and districts to potential growth centres such as ports, industrial areas and commercial centres along the route.

The 15.9km stretch of the Pujut section of the Pan Borneo Highway, which connects the Miri Airport intersection and the Pujut link road, was built at an estimated cost of RM470 million. – Bernama, August 7, 2022.

网友评论